So the bathroom was finished on January 27th 2020, after a long selection process for a shower door.
Since then we have been very busy, installing custom railing into sloped concrete,
taking down walls in a recently sold home. We also installed a door to retain heat from going up the steps.
At this home we replaced siding that had been badly damaged, along with many other interior/exterior repairs for the homeowner. Last but not least a vinyl floor we laid measuring over 600sqft into two rooms, closets and a bathroom.